Heathrow Terminal 2B

Design, supply and installation of 254 reconstructed stone cladding panels to a new Terminal building at Heathrow Airport, the largest panels being 3m wide x 4.2m high weighing 4.7 tonnes. All works completed over a 9 week installation programme. The panels were manufactured using a special mix incorporating black granite aggregate and grey cement and […]

A lazy image

ExCel Exhibition Centre, Phase 2

Design, supply and installation of 24 ramp panels and 20 saddle beam panels to form a ramp in the new extension to ExCel exhibition centre. The 24 ramp panels were 6m long by 2.4m wide and incorporated more than 300No 100mm diameter glass blocks. Approx 6200 glass blocks were used in total. Each ramp panel weighed […]

A lazy image

Dunelm HQ, Leicester

The panels were manufactured using two contrasting mix designs.  One utilised a black granite aggregate and the other a special mix incorporating Limestone aggregate and Spanish Dolomite fines with white cement. The units were supplied complete with insulation, fire stopping and incorporated all necessary stainless steel fixings to the main structure.

A lazy image

Drift Park, Rhyl

The largest units weighed over 12 tonnes and formed the dividing walls to the new theatre area.  Artworks, waterjets, lighting conduit and text were all co-ordinated and incorporated into the design.

A lazy image

Borough Viaduct, London

The position of the projecting rebar links was critical to ensure the units fitted on site and avoided any clashes with pre welded shear studs.  The accuracy of the reinforcement fixing was controlled by the use of jigs in the precast factory.  The precast elements were supplied in a specially designed mix of white concrete

A lazy image

11 Baker Street, London

Double storey height encased steel columns weighed 5.5 Tonnes. The units were manufactured using a special mix incorporating Limestone aggregate and Spanish Dolomite fines with white cement. The units were supplied complete with insulation, fire stopping and incorporated all necessary stainless steel fixings to the main structure. All works completed over a 23 week installation […]