A lazy image

Borough Viaduct, London

The position of the projecting rebar links was critical to ensure the units fitted on site and avoided any clashes with pre welded shear studs.  The accuracy of the reinforcement fixing was controlled by the use of jigs in the precast factory.  The precast elements were supplied in a specially designed mix of white concrete

Architect: Jestico + Whiles
Address: Borough Viaduct, London

Form

Please enable JavaScript in your browser to complete this form.
Name

LiveChat

Click here to Say Hello!

Email

Phone