Latest News

A lazy image

Drift Park, Rhyl

The largest units weighed over 12 tonnes and formed the dividing walls to the new theatre area.  Artworks, waterjets, lighting conduit and text were all co-ordinated and incorporated into the design.

A lazy image

Borough Viaduct, London

The position of the projecting rebar links was critical to ensure the units fitted on site and avoided any clashes with pre welded shear studs.  The accuracy of the reinforcement fixing was controlled by the use of jigs in the precast factory.  The precast elements were supplied in a specially designed mix of white concrete

A lazy image

11 Baker Street, London

Double storey height encased steel columns weighed 5.5 Tonnes. The units were manufactured using a special mix incorporating Limestone aggregate and Spanish Dolomite fines with white cement. The units were supplied complete with insulation, fire stopping and incorporated all necessary stainless steel fixings to the main structure. All works completed over a 23 week installation […]

A lazy image

3 & 10 Finsbury Square, London

Design, supply and installation of more than 350 reconstructed stone panels. 6m long curved panels to the east façade were manufacture to both concave and convex radii of 20m and 40m. The panels were specified to have a grit blasted exposed aggregate finish and were manufactured in a special mix of limestone aggregate, mercaston sand […]

Form

Please enable JavaScript in your browser to complete this form.
Name

LiveChat

Click here to Say Hello!

Email

Phone